Customization: | Available |
---|---|
After-sales Service: | Onsite Installation, 3-Months Onsite Guidance |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Liquid Mineral Water Filling Machine in high-speed 8,000-60,000bph Production Complete Line.
*We supply complete solution for the juice filling machine ,including Water treatment system /Juice mixing system / UHT Sterilizer / Washing filling capping machine / Code sprayer / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system
Containers and specifications | ||||
Project Name: Full Automatic Complete Juice 8000-60000bph Production Line | Hot Filling Fruit Juice | |||
Material | Shape | Filling volume | Filling level(mm) | Neck type |
PET Bottle | Square or Round Bottle | 100-2000ml | Distance from bottle neck According request |
As request |
Adjustable specifications of the bottle type | (Middle Mould Base) Bottle diameter ≤105mm Bottle Height≤335mm | |||
Customers need to buy additional change-over parts for the different bottles. If using square bottles, then bottle separating system will be added. |
||||
Juice Preparation | Fruit , Concentrate, Powder mixing ..... | |||
Container Label & Control Mode | Packaging system | Palletizing system | ||
Hot Melt Roll-Fed PVC Shrink Label Full Label/ Half Label Manual / Automatic |
Packing system | Min, Spec. | Manual Low position gantry palletizer Robot Palletizer High position gantry palletizer Single Arm Palletizer Manual Palletizer |
|
Manual Film shrinker Wrap Around packer Robert Packing Machine |
1*2 2*3 3*4 4*6 3*5 |
|||
User Ambient Conditions | Temperature:10~40ºC;Humidity:No dew | |||
User Electrical Supply Specification | Voltage:380V±5%, 3phase; Frequency:50HZ±1% |
1. Standardized workshop of total 40,000 square meters.We have our own part manufacturing center so as to guarantee the part quality. And also assembling center to make sure a strong capacity of yearly yield.
2. Different types of processing units, such as water jet cutter, plasma cutter, laser cutter, CNC machine from Taiwan chevalier & korea daewoo, ensure the precision of parts.
3. International certification, National Certificate of equipment verification, and more than 30 invention patents are done in King machine .
Verification Certificates of equipments: ISO9001:2001; CE Certificate , SGS , COC , TUV
National Certificate of equipment verification:standard organisation of Nigeria , CNCA certificate, Logo trademark registration, etc.
4.The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
4. Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
5. The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers' requirements to save space.
6. Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
7. World top brands parts to guarantee high quality.
1. Installation, debug
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. Quality guarantee
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4. After sales
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems.
Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
Q2: Do you provide customized service
A2: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
Q3: What's your guarantee or the warranty of the quality if we buy your machines?
A3: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q4: How long time for installation?
A4: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.